ACS of Phosphating, Amination and Hydrazine of boiler BKZ 160–100 PT

Begin: 11(October) 2013
Finish: 12(December) 2014 + 12(December) 2015 (Continuous blowing)
Location: Kramatorsk city, CHP
Customer: Limited liability company (Ltd) "Kramatorskteploenergo", Osipov Jury Mikolajevich
Participants: Roman Savochenko, DIYA Ltd
Description: Automation Control System (ACS) of Phosphating, Amination, Hydrazine, Continuous blowing of the boiler's water of boilers BKZ 160–100 PT №6,7,8,9
Short object's image (105 Kb)


Contents

Object of automation

In exploitation of Kramatorskteploenergo Ltd is a Central Heat Energy (CHM) in contains of five working boilers BKZ 160–100 PT (5, 6, 7, 8 and 9). The boilers produce steam with pressure 100 kgf/cm2 and nominal productivity up to 160 ton/hour. Produced steam transferred to turbines and heat carrier of Kramatorsk city. As fuel of the boilers use the coal dust and the natural gas, mostly for ignition and light. The primary coal is non-gas (anthracite) coals which is less explosive and allow to milling on temperatures up to 150°С.


For supply of the boilers there uses addition and circulation water. The supply water needs for preparation previously for prevent scum formation and corrosion of the common and additive equipment. Same for correcting of the supply water applies of "Amination", "Hydrazine" and "Phosphating" (for boiler's water).


The corrosion decreasing performs by creation the reductive environment into the condensing tract and deep binding of oxygen and nitrite after deaerator through input Recovery, by regulation of рН value of the environment through input Ammonia. Higher grade of the binding of nitrite and residual oxygen can be doing by hydrazine-hydrate (in this case), hydrazine-sulphate, sodium-sulfate.


For prevent the scum formation the boiler's water processes by phosphates. Phosphating is effective way of preventing only to calcium scum formation. As part of the desalting process it is also continuous blowing of the boiler that is continuous flow of the salting water from the boiler's drum bottom. The continuous blowing also included to the ACS "Phosphating".

ACS

Structural scheme of the ACS shown on Figure 1, it is contains four cabinets of controllers and Automation Work Place (AWP) of operator.



Fig. 1. Structural scheme of the ACS.

ACS "Amination" and "Hydrazine" located into a single placement "Water-preparation", but them are implemented into different cabinets CC1 and CC2, accordingly. Into each of the cabinets placed an individual controller, and the controller of ACS "Hydrazine" connected to local network through second interface of the controller of ACS "Amination", where both of the interfaces connected to a "Bridge". Main aim of the ACS "Amination" and "Hydrazine" is dosing transfer of ammonia and hydrazine-hydrate to the supply water, which performs by pumps connected through Frequency Converters (FC). Control by the FC performs from the PLC by the link interface RS-485 and the protocol ModBus/RTU.


ACS "Phosphating" divided to two parts. First part is presented by cabinet CC4 (placement of Central Heat Board) and into it installed PLC, and second part is presented by cabinet CC3 (placement of nonoperative contour of boiler #8) with a tray of Object Adjustment Devices (OAD) and frequency converters of pumps of transferring phosphates to boilers #6,7,8,9. Common signals of ACS connected to the OAD tray which self connected to the PLC by the interface RS-485 and the protocol DCON. Control by the FC of transferring phosphates performs from PLC by the link interface RS-485 and the protocol ModBus/RTU. Connecting the PLC to the local network performs by a switch into the cabinet CC3, moreover the two pares of RS-485 and other two of Ethernet routed between the cabinets CC3 and CC4 by single cable of twist pairs of category 5 by length about 100m.


PLC CC4 (placement of Central Heat Board) besides the functions of the ACS "Phosphating" includes also functions of ACS "Continuous blowing" and ACS "Water Chemical Mode (WChM)", and why had it's naming as "Generic-station".


ACS "Continuous blowing", implemented into the generic-station controller, represented by valves of flow rate of continuous blowing with a pulse control. ACS signals entered direct to the PLC modules. Due to need of controlling the ACS by operator of the boilers it's interface entered to ACS BDM, and the Generic-station PLC enabled to network of ACS "BDM".


ACS "WchM" implemented base on devices of analysis the chemical water mode (UPP) from a previous system, which AWP (implemented on the closed technologies) in time was unworkable. That all this devices UPP (15 items), into the network RS-485 by protocol ModBus/RTU, were connected to the Generic-station PLC. Some parameters of the ACS used into ACS "Amination", "Hydrazine", "Phosphating" and "Continuous blowing" for control to transporting/dosing by the analysis. In generic each of the UPP allow to measure following parameters: "Temperature of the sample", "Value of pH", "Value of cNa", "Value of dissolved O2", "Electrolytic conductivity".


All the nodes of ACS connected to local network of ACS "Water", into an individual mask, which physically has enter to the factory network.

PLC

As a programmable logic controller in the project used PLC LP-8781 of ICP DAS company of LinPAC family. The industrial controller of this family is the first product built on the x86-compatible processor and it is free from low performance into float-point calculations of the environments based on ARM processors.


PLC (Fig. 2) is structurally made in a modular manner, where the modules are installed in the rack. Rack is combined with a processor module and can have 1, 3 or 7 slots for expansion modules. Expansion modules can be of two types, that is modules in parallel and serial bus. Modules on the parallel bus (I-8x) are fast. Modules on the serial bus (I-87x) are installed on the bus of RS-485 interface and operate at a speed of 115000 bps on the DCON protocol. In addition to modules directly into the rack the controller can be expanded with additional racks with modules on the serial bus (I-87x) through the serial interfaces of the processor. One the rack of extension I-87K9 (Fig.3) was been used for acquisition signals of ACS "Phosphating".


ПЛК серии LP-8x81. (77 Kb)
Fig. 2. PLC series LP-8x81.

Корзины расширения I-87Kx. (94 Kb)
Fig. 3. Expansion rack I-87Kx.

The controller's CPU has next technical characteristics:

CPU AMD LX800 processor (32-bit and 500 MHz)
System memory 1 GB RAM
Dual Battery Backup SRAM 512 KB (for 5 years data retain)
Flash 4 GB as IDE Master
EEPROM 16 KB
Data Retention: 40 years; 1,000,000 erase/write cycles
CF Card 8 GB (support up to 32 GB)
64-bit Hardware Serial Number Yes
Dual Watchdog Timer Yes
VGA 640 x 480 ~ 1024 x 768
Ethernet Port RJ-45 x 2, 10/100 Base-TX Ethernet Controller (Auto-negotiating, auto MDI/MDI-X, LED indicator)
USB 1.1 (host) 2
COM1 Internal communication with I-87K modules in slots
COM2 RS-232 (RxD, TxD and GND); Non-isolated
COM3 RS-485 D2+,D2-;self-tuner ASIC inside
Isolation 3000 VDC
COM4 RS-232/RS-485 (RxD, TxD, CTS, RTS and GND forData- for RS-485);
RS-232, Data+ and Data- for RS-485); Non-isolated
COM5 RS-232 (RxD, TxD, CTS, RTS, DSR, DTR, CD, RI and GND); Non-isolated
Input Range +10 VDC ~ +30 VDC
Operating Temperature -25 °C ~ +75 °C

The expansion rack I-87K{X} has next technical characteristics:

COM2 RS-485 (Data+, Data-); Voltage of isolation 3000V.
Power supply Unregulated +10V ... +30V
Operating Temperature -25 ~ +75 °C

Summary capacity of the САУ it is: 27AI, 115DI, 101DO. According to the structure the ACS built on three controllers and on rack of expansion which filling of modules is:

Slot Module Notes
ACS Amination (CC1)
1, 2, 3 LP-8781 Rack to 10 slots with the processor in slots 1-3
4 I-87019RW 8-channels AI.
5 I-87040W 32 channels DI.
6 I-87041W 32 channels DO.
7 Free
8 Free
9 Free
10 Free
ACS Hydrazine (CC2)
1, 2, 3 LP-8781 Rack to 10 slots with the processor in slots 1-3
4 I-87017ZW 10-channels AI.
5 I-87040W 32 channels DI.
6 I-87040W 32 channels DI.
7 I-87041W 32 channels DO.
8 I-87041W 32 channels DO.
9 Free
10 Free
ACS Phosphating (CC3)
1 I-87K9 Rack to 10 slots with the converter in slots 1
2 I-87017ZW 10-channels AI.
3 I-87017ZW 10-channels AI.
4 I-87040W 32 channels DI.
5 I-87041W 32 channels DO.
6 Free
7 Free
8 Free
9 Free
10 Free
Generic-station controller (CC4)
1, 2, 3 LP-8781 Rack to 10 slots with the processor in slots 1-3
4 I-87017ZW 10-channels AI.
5 I-87040W 32 channels DI.
6 I-87041W 32 channels DO.
7 Free
8 Free
9 Free
10 Free

For UPS connection used a USB interface of controller and AWP.


Firmware of the program environment created according to the instruction here.


In process of implementing, testing and exploiting OpenSCADA in role of an execution environment there were detected and fixed some problems, that is:

AWP

Automation Work Place (AWP) of operator implemented in base of monoblock PC "Asus EeeTop PC ET1612" with a sensor screen and following configuration:

Component Naming
Processor Intel Celeron 847 (1.1 ГГц), two core
Chipset Intel HM70
Operational memory DDR3 2 Гб
Solid state drive (SSD) Goodram Play 32GB 2.5"
Interfaces 2 x RS232, RJ-45, 2 x USB 2.0, 2 x USB 3.0, WLAN
Multimedia builtin dynamics 2х1.5 W; microphone; Web-camera; Card reader MMC/SD/SDHC
Keyboard ASUS AK1D
Mouse manipulator ASUS AM1D
Display 15,6" / 1366x768 / Sensor

The operator's AWP was set on a table into placement of laboratory, Figure 4.


АРМ САУ "Вода". (234 Kb)
Fig. 4. АРМ САУ "Вода".

At the AWP was installed the system software environment of ALTLinux T6 and the SCADA-system OpenSCADA 0.9-Work.


The following activities on the system-wide configuration were done, which were collected to an archive and transferred to the customer together with a disk of ACS "Water" project:


In process of implementing, testing and exploiting OpenSCADA in role of SCADA-station was detected and fixed a problems list, that is:


Translation

Інтерфейс користувача

Інформація про технологічний процес відображається на відеокадрах, формованих програмою відображення на екрані дисплею, який входить до складу кожного АРМ. Відображувана інформація має визначену область виводу у межах відеокадру у залежності від його призначення. На рисунку 5 цифрами вказано області виводу відеокадру:

1. панель об'єктів сигналізації;
2. панель вибору типу відображення, навігації за відеокадрами та місцевої квітації;
3. панель управління;
4. робоча область відображення;
5. таблиця актуальних порушень;
6. стани підключень із ПЛК;
7. панель стану із інструментами.


Рис. 5. Структура відеокадру.

Об'єкт управління розбивається функціонально та технологічно на блоки, звані об'єктами сигналізації. Кожному із об'єктів сигналізації ставиться у відповідність набір відеокадрів, об'єднаних у групи. Панель об'єктів сигналізації представляє собою набір екранних кнопок для вибору об'єктів та закріплених за ними груп відеокадрів.


Панель об'єктів сигналізації включає наступні кнопки:


До кожного об'єкту сигналізації можуть бути прив'язані наступні типи відеокадрів:

Мнемосхеми

Вікно мнемосхеми викликається за натиском відповідної кнопки типу відображення і призначено для:

Амінування

Управління процесом амінування здійснюється за посередництвом двох мнемосхем, де перша "Основна" (рис.6) містить мнемонічне зображення технологічного процесу з елементами контролю, а друга "Зовнішні налаштування регулювання" (рис. 7) містить зовнішні налаштування регулювання, відповідно.



Рис. 6. Амінування: мнемосхема "Основна".


Рис. 7. Амінування: мнемосхема "Зовнішні налаштування регулювання".

Переклад

Гідразування

Управління процесом гідразування здійснюється за посередництвом трьох мнемосхем, де перші дві "Основні" (рис. 8 та 9) містять мнемонічне зображення технологічного процесу з елементами контролю, а третя "Зовнішні налаштування регулювання" (рис. 10) містить зовнішні налаштування регулювання, відповідно.



Рис. 8. Гідразування: мнемосхема "Основна 1".


Рис. 9. Гідразування: мнемосхема "Основна 2".


Рис. 10. Гідразування: мнемосхема "Зовнішні налаштування регулювання".

Фосфатування

Управління процесом фосфатування здійснюється за посередництвом двох мнемосхем, де перша "Основна" (рис.11) містить мнемонічне зображення технологічного процесу з елементами контролю, а третя "Зовнішні налаштування регулювання" (рис.12) містить зовнішні налаштування регулювання, відповідно.



Рис. 11. Фосфатування: мнемосхема "Основна".


Рис. 12. Фосфатування: мнемосхема "Зовнішні налаштування регулювання".

Хім. режим води (ВХР)

Контроль за хімічним режимом води здійснюється за посередництвом однієї мнемосхеми зі зведеною таблицею параметрів води (рис. 13).



Рис. 13. Хім. режим води: мнемосхема "Основна".

Діагностика

Контроль за обладнанням САУ здійснюється за посередництвом мнемосхеми "Основна" (рис. 14).



Рис. 14. Діагностика: мнемосхема "Основна".

Неперервна продувка

Управління процесом неперервної продувки здійснюється з АРМів "Млини" за посередництвом мнемосхеми "Основна" (рис.15).



Рис. 15. Неперервна продувка: мнемосхема "Основна".

Група графіків значень параметрів

Вікно групи графіків викликається за натиском відповідної кнопки типу відображення та призначено для перегляду значень до десяти параметрів за визначений час у графічному вигляді.


Передбачено вісім груп графіків технічних параметрів у наступній конфігурації за об'єктами сигналізації:



Рис. 16. Амінування: група графіків "Основна".

Документи

Вікно документів викликається за натиском кнопки типу відображення та містить документ з переліку доступних.

Журнал втручань

Журнал втручань (рис. 17) призначено для перегляду дій оператора, здійснюваних з даного АРМ (зміни стану ключів деблоку, режимів, коефіцієнтів налаштування регуляторів та інше).



Рис. 17. Журнал втручань.

Протокол порушень

Протокол порушень (рис. 18, 19, 20) призначено для перегляду порушень за обраним об'єктом сигналізації (порушення параметром регламентних границь, недостовірність параметру, діагностика параметру та інше).



Рис. 18. Амінування: протокол порушень.


Рис. 19. Гідразування: протокол порушень.


Рис. 20. Фосфатування: протокол порушень.

Посилання

Referring pages: HomePageEn/Server
HomePageEn/Using/KramWater


 
There are no files on this page.[Display files/form]